An Ergonomic Analysis of Main Control Room Console in Nuclear Power Plant Based on Jack

Author(s):  
Yu-Tong Li ◽  
Ming-Ming Liu ◽  
Qing-Huai Huang ◽  
Nan Gao ◽  
Guan-Ron Liu ◽  
...  
Author(s):  
Jia Qianqian ◽  
Guo Chao ◽  
Li Jianghai ◽  
Qu Ronghong

The nuclear power plant with two modular high-temperature gas-cooled reactors (HTR-PM) is under construction now. The control room of HTR-PM is designed. This paper introduces the alarm displays in the control room, and describes some verification and validation (V&V) activities of the alarm system, especially verification for some new human factor issues of the alarm system in the two modular design. In HTR-PM, besides the regular V&V similar to other NPPs, the interference effect of the alarm rings of the two reactor modules at the same time, and the potential discomfort of the two reactor operators after shift between them are focused. Verifications at early stage of the two issues are carried on the verification platform of the control room before the integrated system validation (ISV), and all the human machine interfaces (HMIs) in the control room, including the alarm system are validated in ISV. The test results on the verification platform show that the alarm displays and rings can support the operators understand the alarm information without confusion of the two reactors, and the shift between the two reactor operators have no adverse impact on operation. The results in ISV also show that the alarm system can support the operators well.


2008 ◽  
Vol 238 (12) ◽  
pp. 3522-3527 ◽  
Author(s):  
Sheue-Ling Hwang ◽  
Jhih-Tsong Lin ◽  
Guo-Feng Liang ◽  
Yi-Jan Yau ◽  
Tzu-Chung Yenn ◽  
...  

2016 ◽  
Author(s):  
Katya Lee Le Blanc ◽  
Gordon Ross Bower ◽  
Rachael Ann Hill ◽  
Zachary Alexander Spielman ◽  
Brandon Charles Rice

Author(s):  
Jingxi Li ◽  
Gaofeng Huang ◽  
Lili Tong

The major threat that nuclear power plants (NPPs) pose to the safety of the public comes from the large amount radioactive material released during design-basis accidents (DBAs). Additionally, many aspects of Control Room Habitability, Environmental Reports, Facility Siting and Operation derive from the design analyses that incorporated the earlier accident source term and radiological consequence of NPPs. Depending on current applications, majority of Chinese NPPs adopt the method of TID-14844, which uses the whole body and thyroid dose criteria. However, alternative Source Term (AST) are commonly used in AP1000 and some LWRs (such as Beaver Valley Power Station, Units No. 1 and No. 2, Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 And 2, Kewaunee Power Station and so on), so it is attempted to adopt AST in radiological consequence analysis of other nuclear power plants. By introducing and implementing the method of AST defined in RG 1.183 and using integral safety analysis code, a pressurized water reactor (PWR) of 900 MW nuclear power plant analysis model is constructed and the radiological consequence induced by Main Steam Line Break (MSLB) accident is evaluated. For DBA MSLB, the fractions of core inventory are assumed to be in the gap for various radionuclides and then the release from the fuel gap is assumed to occur instantaneously with the onset of assumed damage. According to the assumptions for evaluating the radiological consequences of PWR MSLB, dose calculation methodology is performed with total effective dose equivalent (TEDE) which is the criteria of dose evaluation. Compared with dose criteria of RG 1.183, the dose of control room, exclusion area boundary and outer boundary of low population zone are acceptable.


Author(s):  
Li Li ◽  
Zhang Shengtao ◽  
Xu Zhao ◽  
Du Yu

For PWR, remote shutdown station (RSS) is a redundant control mean to shut down the reactor when main control room (MCR) inhabitation is challenged (e.g. fire, smoke...). Nowadays, due to nuclear power plants control measures were improved with DCS system, a full function DCS RSS was equipped and more essential equipment could be controlled on RSS. Under operating conditions that prohibit nuclear power plant operators to stay in the main control room, the operators should move to RSS and shutdown the reactor to ensure plant safety following <Moving to remote shutdown station when main control room is un-inhabitable operating strategy> (RSS strategy for short) to fallback the plant from power operation to cold shutdown. The original operating strategy by nature circulation is no longer the best choice both for operation safety and economy efficiency, and an optimized new strategy should be raised. Based on the former reason, an optimized operation strategy was raised in this paper. In the optimized strategy, all plant normal standard operation modes were considered as initial conditions, rather than only considering power operation condition in the original one. The fallback mode and fallback strategy for each initial condition was also designed and optimized. To accelerate the depression and heat removal process, a forced circulation operation strategy is adopted when the reactor coolant pumps are available, and less local operation was included by taking advantages of the full function operating measures on RSS. To simplify the whole procedure structure, the operation modules of other general operating procedures are reused. To validate the effectiveness of the optimized operating strategy, a full scope PWR simulation tool was employed to make thermo hydraulic calculation validation of the reactor response and also the remote control station HMI supporting validation. By simulating the original strategy and the optimized one and related analysis, we found that the optimized strategy is effective, and able to be executed based on the remote control station hardware. By executing the optimized strategy, the unit can fall back to the cold shutdown condition safely and a few hours were saved compared with the original strategy. The optimized strategy had already been implemented on real PWR nuclear power plant.


Sign in / Sign up

Export Citation Format

Share Document