Flow shop scheduling with flexible processing times

OR Spectrum ◽  
2018 ◽  
Vol 40 (3) ◽  
pp. 809-829 ◽  
Author(s):  
Matthias Bultmann ◽  
Sigrid Knust ◽  
Stefan Waldherr
2020 ◽  
Vol 37 (01) ◽  
pp. 1950032
Author(s):  
Myoung-Ju Park ◽  
Byung-Cheon Choi ◽  
Yunhong Min ◽  
Kyung Min Kim

We consider a two-machine flow shop scheduling with two properties. The first is that each due date is assigned for a specific position different from the traditional definition of due dates, and the second is that a consistent pattern exists in the processing times within each job and each machine. The objective is to minimize maximum tardiness, total tardiness, or total number of tardy jobs. We prove the strong NP-hardness and inapproximability, and investigate some polynomially solvable cases. Finally, we develop heuristics and verify their performances through numerical experiments.


Author(s):  
PENG-JEN LAI ◽  
HSIEN-CHUNG WU

The flow shop scheduling problems with fuzzy processing times are investigated in this paper. For some special kinds of fuzzy numbers, the analytic formulas of the fuzzy compltion time can be obtained. For the general bell-shaped fuzzy numbers, we present a computational procedure to obtain the approximated membership function of the fuzzy completion time. We define a defuzzification function to rank the fuzzy numbers. Under this ranking concept among fuzzy numbers, we plan to minimize the fuzzy makespan and total weighted fuzzy completion time. Because the ant colony algorithm has been successfully used to solve the scheduling problems with real-valued processing times, we shall also apply the ant colony algorithm to search for the best schedules when the processing times are assumed as fuzzy numbers. Numerical examples are also provided and solved by using the commercial software MATLAB.


The present paper investigates n×3 specially structured flow shop scheduling model with processing of jobs on given machines in a string of disjoint job blocks and with probabilities associated to the processing times of jobs. The objective is to minimize utilization time of second and third machine and also minimize the total elapsed time for processing the jobs for n×3 specially structured flow shop scheduling problem. The algorithm developed in this paper is quite straightforward and easy to understand and also present an essential way out to the decision maker for attaining an optimal sequence of jobs. The algorithm developed in this paper is validated by a numerical illustration.