Type-E disassembly line balancing problem with multi-manned workstations
2019 ◽
Vol 21
(2)
◽
pp. 611-630
◽
2018 ◽
Vol 30
(4)
◽
pp. 681
Keyword(s):
2021 ◽
2007 ◽
Vol 40
(2)
◽
pp. 69-74
◽
2019 ◽
Vol 211
◽
pp. 115-133
◽
Keyword(s):