Comparison and correlation between the laboratory, semi-theoretical and empirical methods in predicting the field excavation performance of tunnel boring machine (TBM)
2017 ◽
Vol 50
(10)
◽
pp. 2805-2816
◽
2020 ◽
Vol 140
(3)
◽
pp. 320-325
2016 ◽
Vol 33
(3)
◽
pp. 317
2021 ◽
Vol 727
(1)
◽
pp. 012010
2013 ◽
Vol 73
(1)
◽
pp. 23-35
◽
Keyword(s):
Keyword(s):
Keyword(s):
2022 ◽
Vol 121
◽
pp. 104337
Keyword(s):