Correction to: An extension of the general lot-sizing and scheduling problem (GLSP) with time-dependent energy prices
2019 ◽
Vol 89
(6)
◽
pp. 739-742
◽
Keyword(s):
2018 ◽
Vol 89
(5)
◽
pp. 481-514
◽
Keyword(s):
2013 ◽
Vol 37
(23)
◽
pp. 9516-9523
◽
Keyword(s):
Keyword(s):
2015 ◽
pp. 157-170
Keyword(s):
2015 ◽
Vol 63
◽
pp. 72-82
◽
2020 ◽
Vol 284
(3)
◽
pp. 861-873
◽
2009 ◽
Vol 199
(1)
◽
pp. 139-149
◽
Keyword(s):
Keyword(s):
2019 ◽
pp. 1-16
◽