The effects of inspection delay and restoration cost on the optimal inspection and production policy

OPSEARCH ◽  
2017 ◽  
Vol 55 (1) ◽  
pp. 187-195 ◽  
Author(s):  
W. C. Tsai ◽  
Neng-Hui Shih ◽  
Chih-Hsiung Wang
2016 ◽  
Author(s):  
Jean M. Daniels ◽  
Weston Brinkley ◽  
Michael D. Paruszkiewicz

2021 ◽  
Vol 14 (2) ◽  
pp. 116-128
Author(s):  
Wenjun Yan

Abstract In 2015, the All-China Environment Federation v Dezhou Jinghua Group Zhenhua Corporation Limited case was the first civil environmental public interest litigation (CEPIL) against air pollution in China. Constituting a milestone in the field of air pollution control in China, this case (i) confirms the eligibility of a non-governmental organisation (NGO) to file civil public interest litigations; (ii) discusses remedies for the ecological destruction caused by air pollution; (iii) assesses the ecological and environmental damage using the ‘virtual restoration cost’ method; and (iv) uses public apology as an innovative way for Zhenhua to assume liability. By applying and interpreting several important rules under the Environmental Protection Law of China (EPLC) for the first time, this case sets an example for future CEPILs against air pollution in China.


2011 ◽  
Vol 3 (1/2) ◽  
pp. 21 ◽  
Author(s):  
Jing Jiang Zhang ◽  
Teng Fei Nie ◽  
Shao Fu Du

Sign in / Sign up

Export Citation Format

Share Document