Shop Load Plan, Master Schedule and Shop Schedules: Example Forms and Steps on How to Use

Keyword(s):  
2019 ◽  
Vol 13 (1) ◽  
pp. 43
Author(s):  
Sitti Safiatus Riskijah

Pekerjaan struktur beton bertulang pada Proyek Gedung Terminal Utama Bandara Internasional X yang dilaksanakan dengan sistem zona bersifat pengulangan pekerjaan dan membutuhkan banyak material yang perlu dikelola. Untuk itu diperlukan metode yang tepat agar jumlah persediaan material ekonomis. Penelitian ini bertujuan menentukan biaya persediaan material termurah pada pekerjaan kolom dan balok beton zona 1. Data yang diperlukan yaitu master schedule proyek, bill of quantity, dan harga satuan pekerjaan. Analisis persediaan material menggunakan metode MRP (Material Requirement Planning dengan teknik LFL, EOQ, POQ, dan FPR. Hasil penelitian: 1) Metode LFL (Lot For Lot) menghasilkan biaya persediaan termurah, dengan jumlah persediaan besi tulangan D32, D25, D22, D19, D16, D13, D10 masing-masing sejumlah 802,  5589, 30, 1363, 808, 185, dan 12528 lonjor; multipleks 12 mm 2579 lembar; kayu meranti 5/7 1157 batang, kayu meranti 6/12 570 batang, kayu meranti 8/12 424 batang; paku 358 kg; beton readymix FC’35 2362 m3;  bekisting bulat kolom D1,9, D1,8, D1,3, D1,25, dan D1,2 masing-masing 17; 20; 10; 17; dan 68 unit; tiang penyangga 306 batang; mur baut 914 unit;2) Total biaya persediaan material struktur yang ekonomis Rp 8.357.029.000; dan 3) Jadwal pemesanan material dilakukan 2 minggu sebelum penggunaan material, dan jadwal kedatangan material sesuai dengan jadwal kebutuhan material.Kata-kata Kunci: balok, bandara, kolom, material requirement planning, persediaan material


2020 ◽  
pp. 92-109
Author(s):  
Carol Elise Canady ◽  
Robert Lynn Canady
Keyword(s):  

1962 ◽  
Vol 42 (4) ◽  
pp. 255-257
Author(s):  
Margaret F. Lambert
Keyword(s):  

Author(s):  
Anthony D'Antuono ◽  
William Shaw Mccallum
Keyword(s):  

2011 ◽  
Vol 314-316 ◽  
pp. 2046-2054
Author(s):  
Rui Li ◽  
Yu Jun Liu ◽  
Kunihiro Hamada

Manufacturing of ship piping systems is one of the major production activities in shipbuilding. The schedule of pipe production has an important impact on the master schedule of shipbuilding. In this research, the ITOC concept was introduced to solve the scheduling problems of a piping jobshop, and an intelligent scheduling system was developed. The system, in which a product model, an operation model, a factory model, and a knowledge database of piping production were integrated, automated the planning process and production scheduling. Details of the above points were discussed. Moreover, an application of the system in a piping factory, which achieved a higher level of performance as measured by tardiness, lead time, and inventory was demonstrated.


1956 ◽  
Vol 27 (8) ◽  
pp. 56-57
Author(s):  
Leslie Agnello ◽  
Louis Toschi
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document