Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
2019 ◽
Vol 135
◽
pp. 79-104
◽
2018 ◽
Vol 51
(4)
◽
pp. 680-698
◽
Keyword(s):
2012 ◽
Vol 50
(24)
◽
pp. 7447-7466
◽
Keyword(s):
Keyword(s):