makespan minimization
Recently Published Documents


TOTAL DOCUMENTS

208
(FIVE YEARS 42)

H-INDEX

24
(FIVE YEARS 3)

Author(s):  
Anupam Gupta ◽  
Amit Kumar ◽  
Viswanath Nagarajan ◽  
Xiangkun Shen

2021 ◽  
Vol 5 (2) ◽  
pp. 1-8
Author(s):  
SATHIYA SHANTHI R ◽  
MEGANATHAN R ◽  
JAYAKUMAR S ◽  
VIJAYARAGAVAN R

Scheduling process arises naturally upon availability of resources through a systematic approach in which prior planning and decisions should be made. Two machine flow shop scheduling problem (FSSP) was solved by Johnson in the mid of 1954 with makespan minimization as objective. Earlier we proposed two algorithms for the makespan objective; in this paper we intend to investigate the same algorithms for the objective of Total Completion Time of all the jobs (TCT). Experimental results had shown that one of our algorithms gives better results than the other two when the machine order is reversed.


Author(s):  
Lennart Zey ◽  
Dirk Briskorn ◽  
Nils Boysen

AbstractTo enable the efficient division of labor in container yards, many large ports apply twin cranes, two identical automated stacking cranes each dedicated to one of the transfer zones on the seaside and landside. The use of a handshake area, a bay of containers that separates the dedicated areas of the two cranes, is a simple means to avoid crane interference. Inbound containers arriving in the transfer zone of one crane and dedicated to a stacking position of the other crane’s area are placed intermediately in the handshake area by the first crane and then taken over by the second crane, and vice versa for outbound containers. Existing research only evaluates simple heuristics and rule-based approaches for the coordination of twin cranes interconnected by a handshake area. For this setting, accounting for precedence constraints due to stacking containers in the handshake area, we derive exact solution procedures under a makespan minimization objective. In this way, a comprehensive computational evaluation is enabled, which benchmarks heuristics with optimal solutions and additionally compares alternative crane settings (i.e., without workload sharing and cooperation with flexible handover). We further provide insights into where to position the handshake area. Our results reveal that when planning is too simple (i.e., with a rule-based approach), optimality gaps become large, but with sophisticated optimization, the price of a simplified crane coordination via a handshake area is low.


Author(s):  
Marin Bougeret ◽  
Klaus Jansen ◽  
Michael Poss ◽  
Lars Rohwedder

Algorithmica ◽  
2021 ◽  
Author(s):  
Susanne Albers ◽  
Maximilian Janke

AbstractMakespan minimization on identical machines is a fundamental problem in online scheduling. The goal is to assign a sequence of jobs to m identical parallel machines so as to minimize the maximum completion time of any job. Already in the 1960s, Graham showed that Greedy is $$(2-1/m)$$ ( 2 - 1 / m ) -competitive. The best deterministic online algorithm currently known achieves a competitive ratio of 1.9201. No deterministic online strategy can obtain a competitiveness smaller than 1.88. In this paper, we study online makespan minimization in the popular random-order model, where the jobs of a given input arrive as a random permutation. It is known that Greedy does not attain a competitive factor asymptotically smaller than 2 in this setting. We present the first improved performance guarantees. Specifically, we develop a deterministic online algorithm that achieves a competitive ratio of 1.8478. The result relies on a new analysis approach. We identify a set of properties that a random permutation of the input jobs satisfies with high probability. Then we conduct a worst-case analysis of our algorithm, for the respective class of permutations. The analysis implies that the stated competitiveness holds not only in expectation but with high probability. Moreover, it provides mathematical evidence that job sequences leading to higher performance ratios are extremely rare, pathological inputs. We complement the results by lower bounds, for the random-order model. We show that no deterministic online algorithm can achieve a competitive ratio smaller than 4/3. Moreover, no deterministic online algorithm can attain a competitiveness smaller than 3/2 with high probability.


2021 ◽  
Author(s):  
S. Sabahat H. Bukhari ◽  
Muhammad Usman Younus ◽  
Zain-ul-Abidin Jaffari ◽  
Muhammad Arshad Shehzad Hassan ◽  
Muhammad Rizwan Anjum ◽  
...  

Abstract The edge computing model offers an ultimate platform to support scientific and real-time workflow-based applications over the edge of the network. However, scientific workflow scheduling and execution still facing challenges such as response time management and latency time. This leads to deal with the acquisition delay of servers, deployed at the edge of a network and reduces the overall completion time of workflow. Previous studies show that existing scheduling methods consider the static performance of the server and ignore the impact of resource acquisition delay when scheduling workflow tasks. Our proposed method presented a meta-heuristic algorithm to schedule the scientific workflow and minimize the overall completion time by properly managing the acquisition and transmission delays. We carry out extensive experiments and evaluations based on commercial clouds and various scientific workflow templates. The proposed method has approximately 7.7% better performance than the baseline algorithms, particularly in overall deadline constraint that gives a success rate.


2021 ◽  
Vol 2 ◽  
pp. 1-15
Author(s):  
Edvin Åblad ◽  
Ann-Brith Strömberg ◽  
Domenico Spensieri

Sign in / Sign up

Export Citation Format

Share Document