Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
2018 ◽
Vol 51
(4)
◽
pp. 680-698
◽
Keyword(s):
2012 ◽
Vol 66
(9-12)
◽
pp. 1563-1572
◽
Keyword(s):
2015 ◽
Vol 87
◽
pp. 30-39
◽
Keyword(s):
2013 ◽
Vol 70
(5-8)
◽
pp. 1181-1188
◽
2016 ◽
Vol 8
(6)
◽
pp. 3021-3026
◽
Keyword(s):
2016 ◽
Vol 90
(1-4)
◽
pp. 93-107
◽
2013 ◽
Vol 32
(1)
◽
pp. 167-173
◽
2019 ◽
Vol 135
◽
pp. 79-104
◽
Keyword(s):
Keyword(s):