Single machine group scheduling with resource dependent setup and processing times

2005 ◽  
Vol 162 (1) ◽  
pp. 112-121 ◽  
Author(s):  
Adam Janiak ◽  
Mikhail Y. Kovalyov ◽  
Marie-Claude Portmann
2012 ◽  
Vol 2012 ◽  
pp. 1-9 ◽  
Author(s):  
Yong He ◽  
Li Sun

We consider two single-machine group scheduling problems with deteriorating group setup and job processing times. That is, the job processing times and group setup times are linearly increasing (or decreasing) functions of their starting times. Jobs in each group have the same deteriorating rate. The objective of scheduling problems is to minimize the sum of completion times. We show that the sum of completion times minimization problems remains polynomially solvable under the agreeable conditions.


2015 ◽  
Vol 2015 ◽  
pp. 1-9
Author(s):  
Ping Ji ◽  
Lin Li

This paper considers two resource constrained single-machine group scheduling problems. These problems involve variable job processing times (general position-dependent learning effects and deteriorating jobs); that is, the processing time of a job is defined by the function that involves its starting time and position in the group, and groups’ setup time is a positive strictly decreasing continuous function of the amount of consumed resource. Polynomial time algorithms are proposed to optimally solve the makespan minimization problem under the constraint that the total resource consumption does not exceed a given limit and the total resource consumption minimization problem under the constraint that the makespan does not exceed a given limit, respectively.


2018 ◽  
Vol 117 ◽  
pp. 1-5 ◽  
Author(s):  
Xin Zhang ◽  
Lijuan Liao ◽  
Wenya Zhang ◽  
T.C.E. Cheng ◽  
Yuanyuan Tan ◽  
...  

2015 ◽  
Vol 2015 ◽  
pp. 1-9 ◽  
Author(s):  
Xingong Zhang ◽  
Qiulian Xie

We investigate a single machine group scheduling problem with position dependent processing times and ready times. The actual processing time of a job is a function of positive group-dependent job-independent positional factors. The actual setup time of the group is a linear function of the total completion time of the former group. Each job has a release time. The decision should be taken regarding possible sequences of jobs in each group and group sequence to minimize the makespan. We show that jobs in each group are scheduled in nondecreasing order of its release time and the groups are arranged in nondecreasing order of some certain conditions. We also present a polynomial time solution procedure for the special case of the proposed problem.