Heuristics for multi-item two-echelon spare parts inventory control subject to aggregate and individual service measures

2017 ◽  
Vol 256 (1) ◽  
pp. 126-138 ◽  
Author(s):  
Engin Topan ◽  
Z. Pelin Bayındır ◽  
Tarkan Tan
Procedia CIRP ◽  
2018 ◽  
Vol 73 ◽  
pp. 278-283
Author(s):  
Yue Tang ◽  
Yaoguang Hu ◽  
Yu Liu ◽  
Jingqian Wen

Omega ◽  
2015 ◽  
Vol 57 ◽  
pp. 217-229 ◽  
Author(s):  
Willem van Jaarsveld ◽  
Twan Dollevoet ◽  
Rommert Dekker

2012 ◽  
Vol 605-607 ◽  
pp. 1665-1669
Author(s):  
Hong Qiang Gu ◽  
Cheng Zhang ◽  
Quan Shi

Inventory control strategy of spare parts is an effective way to improve equipment support efficiency and scientific and reasonable inventory policy can make spare parts availability reach the upper limit. Multi-echelon integrated inventory control strategy of equipment spare parts is studied. Three-level integrated inventory control model consisting of rear warehouse, equipment using units and spare parts supplier is established according to the architecture and control program of multi-echelon joint inventory. The algorithm of solving the proposed model is analyzed and a numerical example is provided. The proposed equipment spare parts inventory model can improve inventory quality to a certain degree and decrease the contradictions between inventory and maintenance. The correctness and effectiveness of the proposed model are verified by the example, which provides an effective model for equipment spare parts inventory.


Sign in / Sign up

Export Citation Format

Share Document