A note on scheduling a maintenance activity and due-window assignment based on common flow allowance
2013 ◽
Vol 145
(2)
◽
pp. 645-646
◽
2012 ◽
Vol 135
(1)
◽
pp. 222-230
◽
2014 ◽
Vol 644-650
◽
pp. 2026-2029
Keyword(s):
Due-Window Assignment for a Single Machine Scheduling with Both Deterioration and Positional Effects
2015 ◽
Vol 32
(03)
◽
pp. 1550014
◽
2013 ◽
Vol 344
◽
pp. 275-278
Keyword(s):
2015 ◽
Vol 165
◽
pp. 155-157
◽
2015 ◽
Vol 57
◽
pp. 33-40
◽
2015 ◽
Vol 54
(12)
◽
pp. 3475-3490
◽
Keyword(s):
A two-agent single machine scheduling problem with due-window assignment and a common flow-allowance
2016 ◽
Vol 33
(4)
◽
pp. 1454-1468
◽
Keyword(s):
2009 ◽
Vol 36
(9)
◽
pp. 2541-2545
◽