scholarly journals A Real-Time Rolling Horizon Chance Constrained Optimization Model for Energy Hub Scheduling

2020 ◽  
Vol 62 ◽  
pp. 102417
Author(s):  
Weilin Hou ◽  
Zhaoxi Liu ◽  
Li Ma ◽  
Lingfeng Wang
2014 ◽  
Vol 596 ◽  
pp. 234-240
Author(s):  
Shao Meng Chen ◽  
Yue Tong Xu ◽  
Qiu Xu Hu ◽  
Zheng Tuo Wang

Real-time industrial control software often has the characteristic of multitask communication within single thread, which can easily cause the thread to block. The problem can be abstracted into nonlinear constrained optimization model based on requirements of developing the industrial control software, and solved by artificial bee colony algorithm. The ABC algorithm needs less parameters, and has stronger capability of global search than other intelligent algorithms. Considering characteristics of the nonlinear constrained optimization model, three modifications are adopted to improve the capability of global search in this problem. They are a modification rate for generating a new solution, the probability of selecting a new solution by onlooker bees which is different between feasible solutions and infeasible solutions, Deb’s constrainted handling method. A comparing result shows that the modified ABC algorithm provides a better solution than GA algorithm does. By putting the solution into practice, high-speed and reliable communication can be realized between IPC, PLC and NC.


Sign in / Sign up

Export Citation Format

Share Document