00/01414 Biomass gasification in atmospheric and bubbling fluidized bed: Effect of the type of gasifying agent on the product distribution

2000 ◽  
Vol 41 (3) ◽  
pp. 158 ◽  
2021 ◽  
Vol 235 ◽  
pp. 113981
Author(s):  
M. Puig-Gamero ◽  
D.T. Pio ◽  
L.A.C. Tarelho ◽  
P. Sánchez ◽  
L. Sanchez-Silva

2021 ◽  
pp. 131847
Author(s):  
Dali Kong ◽  
Kun Luo ◽  
Shuai Wang ◽  
Jiahui Yu ◽  
Jianren Fan

Author(s):  
D.V. Baratha Dodawatta ◽  
U.D. Indula ◽  
N.A.C.J.D. Senarathna ◽  
D.G.C. Wickramasinghe ◽  
M. Narayana

2019 ◽  
Vol 196 ◽  
pp. 1-17 ◽  
Author(s):  
Shiliang Yang ◽  
Hua Wang ◽  
Yonggang Wei ◽  
Jianhang Hu ◽  
Jia Wei Chew

1997 ◽  
Vol 11 (6) ◽  
pp. 1109-1118 ◽  
Author(s):  
Javier Gil ◽  
María P. Aznar ◽  
Miguel A. Caballero ◽  
Eva Francés ◽  
José Corella

2021 ◽  
Vol 239 ◽  
pp. 00007
Author(s):  
Carlos Vargas-Salgado ◽  
Lina Montuori ◽  
Manuel Alcázar-Ortega

Despite being a renewable source, biomass as fuel for power generation is still not completely exploited. In biomass gasification plants, control operations are crucial for the proper management of the plant. This paper describes the results of a regulation control applied to an experimental biomass bubbling fluidized bed (BFB) gasification plant. The aim of implementing the system is to improve the biomass gasification process, increasing the efficiency and ensuring the safety in the plant operation. The equivalence ratio (ER) is one of the main parameters in a gasification process. To improve the ER, the airflow input is controlled, measuring the air velocity through an anemometer. On the other hand, the biomass flow is controlled modifying the speed of the screw conveyor using an inverter for regulating the frequency of its electric motor. A PLC is used for programming the instructions to implement control functions and to store the data given by the measurement devices. Once implemented the control system, the biomass gasification plant could work either; manually o automatically, allowing to adjust ER, increasing efficiency of the process. Finally, some tests are done to validate the control system, using the acquired data to improve the process.


2018 ◽  
Vol 138 ◽  
pp. 774-782 ◽  
Author(s):  
Juhui Chen ◽  
Xiao Shi ◽  
Shuai Wang ◽  
Jiahao Li ◽  
Ting Hu ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document