Comments on “New General Continuous-Time State−Task Network Formulation for Short-Term Scheduling of Multipurpose Batch Plants” by Christos T. Maravelias and Ignacio E. Grossmann and on “Enhanced Continuous-Time Unit-Specific Event-Based Formulation for Short-Term Scheduling of Multipurpose Batch Processes: Resource Constraints and Mixed Storage Policies” by Stacy L. Janak, Xiaoxia Lin, and Christodoulos A. Floudas
2005 ◽
Vol 44
(6)
◽
pp. 1985-1986
◽
Keyword(s):
2005 ◽
Vol 44
(2)
◽
pp. 426-426
◽
Keyword(s):
2004 ◽
Vol 43
(10)
◽
pp. 2516-2533
◽
Keyword(s):
2010 ◽
Vol 49
(16)
◽
pp. 7446-7469
◽
Keyword(s):
2008 ◽
Vol 32
(1-2)
◽
pp. 260-274
◽
2013 ◽
Vol 52
(36)
◽
pp. 12950-12972
◽
2012 ◽
Vol 51
(21)
◽
pp. 7300-7319
◽
Keyword(s):
2015 ◽
Vol 2015
◽
pp. 1-15
◽
Keyword(s):
Keyword(s):
2012 ◽
Vol 43
◽
pp. 148-172
◽