Research on distributed wind farm reactive power optimization method considering voltage quality

Author(s):  
M. Teng ◽  
Z. Aijun ◽  
L. Shichuan ◽  
G. Yu ◽  
J. Liu ◽  
...  
2014 ◽  
Vol 1008-1009 ◽  
pp. 421-425
Author(s):  
Yong Jin Chen ◽  
Jie He Su ◽  
Yong Jun Zhang ◽  
Ying Qi Yi

A reactive power optimization method based on interval arithmetic is presented to solve the uncertainty of the output of distributed generation (DG) and the effects of load fluctuation. The concept of interval number and interval arithmetic is introduced to model the interval power flow of distribution system, which is iterated by using the Krawczyk-Moore operator. The objective function is to minimize the interval midpoint value of system’s power loss, with taking the interval voltage constraints into consideration for the interval reactive power optimization model. A modified IEEE 14-bus system is used to validate the proposed model and its Particle Swarm Optimization (PSO) algorithm. The simulation results show that the proposed method is effective.


2014 ◽  
Vol 971-973 ◽  
pp. 979-982
Author(s):  
Yan Hong Li ◽  
Zhi Rong Zhang

Automatic voltage control(AVC) is the highest form of current power grid voltage and reactive power control,during the implementation of AVC, the whole network reactive power optimization isthe core and foundation. Thispaper researches and discuses the application of reactive power optimization inpower grid AVC. In the traditional reactive power optimization, the reactivepower limits of synchronous generators are fixed. In this paper, thesynchronous generator PQ operating limits change with external conditions,thus establishes reactive power optimization model in accordance with therequirements of AVC. Thispaper presents reactive power optimization method based on the principle ofpartition. The method decomposes the system to several partitions. Eachpartition separately optimized, thus reduces the system scale.And the convergence of the algorithm, the calculation speed and the discretevariable processing etc. improve. At the same time, this method reflects theclassification, hierarchical, partition, characteristics of coordinated controlof AVC.


2014 ◽  
Vol 953-954 ◽  
pp. 543-551
Author(s):  
Peng Sun ◽  
Ming Wu Luo ◽  
Chao Xia Sun

Reactive power optimization scheduling problem of wind plant including capacitor and fan is researched in this paper. According to the structure of the wind plant to set different scenarios , aiming at minimizing the reactive power loss , establish the reactive power optimization mathematical model of the wind plant, calculate the optimal reactive power of wind turbine in different positions , minimize the reactive power loss inside wind plant under the constraints of the offset range of node voltage and the reactive power demand of grid. Through the analysis of examples,clear whether a reasonable reactive scheduling scheme can be getted, and present the optimization result . Keywords: Wind plant,Reactive power optimization scheduling,DE algorithm


2016 ◽  
Vol 12 (02) ◽  
pp. 10
Author(s):  
Liang Sun ◽  
Xusheng Jian ◽  
Wenqiang Yuan

In the paper, the influence of harmonic was taken into consideration during the realization of the AVC system in the power grid of Wuhu region, relevant study and development were conducted from the perspective of application and practice, and concrete proposal of practicable reactive voltage power optimization was put forward. The system adopted two-layer control plan: whole-network coordination layer and execution layer within transformer substation. Optimization algorithm adopted the reactive power optimization method with relaxed constraints so as to improve the convergence and computation speed of reactive power optimization. To control the impact of harmonic, a hybrid active power filter scheme which was made up of passive power filter and active power filter was adopted, thus improving the cost performance of the AVC system. The result of applying the AVC system in the power grid of Wuhu region shows that the system is stable and reliable, obviously decreasing the operation times of equipment and improving the voltage qualified rate and power factor of panel point.