Experimental Verification of the Feasibility of a Novel Prestressed Reactive Powder Concrete Box-Girder Bridge Structure

2017 ◽  
Vol 22 (6) ◽  
pp. 04017015 ◽  
Author(s):  
Xudong Shao ◽  
Rensheng Pan ◽  
Hao Zhan ◽  
Wei Fan ◽  
Zhijie Yang ◽  
...  
2015 ◽  
Vol 111 ◽  
pp. 470-477 ◽  
Author(s):  
Lukáš Krkoška ◽  
Martin Moravčík

2010 ◽  
Vol 163-167 ◽  
pp. 2369-2375 ◽  
Author(s):  
Ming Yuan ◽  
Dong Huang Yan

The stress state of finished bridge and service stage is influenced by various closure schemes in cantilever construction of multi-span prestressed concrete box-girder bridge. Two typical bridges—multi-span prestressed concrete continuous rigid frame bridge and girder bridge are investigated, The stress state in different closure schemes are analyzed using finite element(FE) analysis. Meanwhile, compared the healthy monitoring data, it has been found that taking the closure sequence from side span to middle span in cantilever construction of multi-span prestressed concrete box-girder bridge can lower stress of girder and pier in finished bridge stage, as well as reducing deformation of girder in service stage. Hence, the closure sequence from side span to middle span is more suitable for cantilever construction of multi-span prestressed concrete box-girder bridge.


Sign in / Sign up

Export Citation Format

Share Document