Opportunistic maintenance optimization for offshore wind turbine electrical and electronic system based on rolling horizon approach

2017 ◽  
Vol 9 (3) ◽  
pp. 033307 ◽  
Author(s):  
Yang Lu ◽  
Liping Sun ◽  
Jichuan Kang ◽  
Hai Sun ◽  
Xinyue Zhang
2018 ◽  
Vol 25 (2) ◽  
pp. 123-131 ◽  
Author(s):  
Yang Lua ◽  
Liping Suna ◽  
Jichuan Kanga ◽  
Xinyue Zhang

Abstract In future, offshore wind turbines may be consider a crucial part in the supply of energy. Maintenance processes are directed to attain a safe and reliable operation of offshore machines and wind turbines. In this paper, an opportunistic maintenance strategy for offshore wind turbine is proposed, considering imperfect maintenance and the preventive maintenance durations. Reliability Centric Maintenance serves as a proactive tactic to operations and maintenance by inhibiting the possible reasons of poor performance and controlling failures. Other components can implement the opportunistic preventive maintenances if one component has reached its reliability threshold. According to the rolling horizon approach, it is of great importance to update the maintenance planning for the sake of the short-term information. By figuring out the best combination, the maintenance schedule in the mission time has been finally determined. Failure information are obtained from previous studies to accomplish the calculations. The outcomes indicate that the maintenance cost has been dramatically reduced through the application of opportunistic maintenance.


2021 ◽  
pp. 147592172098183
Author(s):  
Muhammad Farhan ◽  
Ronald Schneider ◽  
Sebastian Thöns

Predictive information and maintenance optimization for deteriorating structures is concerned with scheduling (a) the collection of information by inspection and monitoring and (b) maintenance actions such as repair, replacement, and retrofitting based on updated predictions of the future condition of the structural system. In this article, we consider the problem of jointly identifying—at the beginning of the service life—the optimal inspection time and repair strategy for a generic welded joint in a generic offshore wind turbine structure subject to fatigue. The optimization is performed based on different types of decision analyses including value of information analyses to quantify the expected service life cost encompassing inspection, repair, and fatigue damage for all relevant combinations of inspection time, repair method, and repair time. Based on the analysis of the expected service life cost, the optimal inspection time, repair method, and repair time are identified. Possible repair methods for a welded joint in an offshore environment include welding and grinding, for which detailed models are formulated and utilized to update the joint’s fatigue performance. The decision analyses reveal that an inspection should be scheduled approximately at mid-service life of the welded joint. A repair should be performed in the same year after an indication and measurement of a fatigue crack given an optimal inspection scheduling. This article concludes with a discussion on the results obtained from the decision and value of information analyses.


2019 ◽  
Vol 44 (5) ◽  
pp. 455-468
Author(s):  
Xie Lubing ◽  
Rui Xiaoming ◽  
Li Shuai ◽  
Hu Xin

The maintenance costs of offshore wind turbines operated under the irregular, non-stationary conditions limit the development of offshore wind power industry. Unlike onshore wind farms, the weather conditions (wind and waves) have greater impacts on the operation and maintenance of offshore wind farm. Accessibility is a key factor related to the operation and maintenance of offshore wind turbine. Considering the impact of weather conditions on the maintenance activities, the Markov method and dynamic time window are applied to represent the weather conditions, and an index used to evaluate the maintenance accessibility is then proposed. As the wind turbine is a multi-component complex system, this article uses the opportunistic maintenance strategy to optimize the preventive maintenance age and opportunistic maintenance age for the main components of the wind turbine. Taking the minimum expectation cost as objective function, this strategy integrates the maintenance work of the key components. Finally, an offshore wind farm is taken for simulation case study of this strategy; the results showed that the maintenance cost of opportunistic maintenance strategy is 10% lower than that of the preventive maintenance strategy, verifying the effectiveness of the opportunistic maintenance.