Iterative algorithms for batching and scheduling to minimise the total job tardiness in two-stage hybrid flow shops
2017 ◽
Vol 55
(11)
◽
pp. 3266-3282
◽
2008 ◽
Vol 42
(9-10)
◽
pp. 963-973
◽
2011 ◽
Vol 23
(6)
◽
pp. 2271-2280
◽
Keyword(s):
2009 ◽
Vol 56
(1)
◽
pp. 113-120
◽
Keyword(s):
2006 ◽
Vol 175
(2)
◽
pp. 1321-1327
◽
2009 ◽
Vol 9
(10)
◽
pp. 1943-1949
◽
2020 ◽
Vol 39
(4)
◽
pp. 439
Keyword(s):
2014 ◽
Vol 33
(4)
◽
pp. 647-653
◽
Keyword(s):