Speed scaling in two-machine lot-streaming flow shops with consistent sublots
2014 ◽
Vol 37
(4)
◽
pp. 187-192
Keyword(s):
Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
2002 ◽
Vol 29
(10)
◽
pp. 1301-1315
◽
Keyword(s):
The Mean
◽
2011 ◽
pp. 576-583
1997 ◽
Vol 96
(3)
◽
pp. 591-611
◽
2012 ◽
Vol 24
(6)
◽
pp. 1185-1196
◽
Keyword(s):
1999 ◽
Vol 37
(2)
◽
pp. 160-173
2011 ◽
Vol 24
(1)
◽
pp. 175-191
◽
2010 ◽
Vol 52
(5-8)
◽
pp. 699-713
◽