The integrated supply chain model considering process mean, replenishment cycle time and credit period
Keyword(s):
Keyword(s):
Integrated supply chain model for a deteriorating item with procurement cost dependent credit period
2013 ◽
Vol 64
(3)
◽
pp. 788-796
◽
Keyword(s):
2014 ◽
Vol 47
(5)
◽
pp. 995-1007
◽
Keyword(s):
Keyword(s):
Keyword(s):
2004 ◽
Vol 17
(3)
◽
pp. 1-19
◽
Keyword(s):
The Effect of Various Parameters of Solution Methodology on a Flexible Integrated Supply Chain Model
2018 ◽
Vol 2018
◽
pp. 1-14
◽
Keyword(s):
Determining optimal process mean and quality improvement in a profit-maximization supply chain model
2017 ◽
Vol 16
(2)
◽
pp. 154-169
◽
Keyword(s):
2017 ◽
Vol 56
(15)
◽
pp. 5234-5248
◽
Keyword(s):