Economic design of continuous sampling plan under linear inspection cost

2002 ◽  
Vol 29 (7) ◽  
pp. 1003-1009 ◽  
Author(s):  
Chung-Ho Chen ◽  
Chao-Yu Chou
2021 ◽  
Vol 14 ◽  
pp. 123-127
Author(s):  
Yuanpeng Sun

The article studies the supply chain of suppliers and manufacturers, considering the overall benefits of the supply chain, the measurement sampling plan is the small batch sampling plan with the smallest amount of sampling and the strongest discriminative ability. If the quality characteristic data is a measurement value, and the inspection workload is large and the inspection cost is high, it is recommended to adopt the measurement sampling plan based on the Laplace distribution. On the premise of ensuring quality, try to reduce the number of inspected samples as much as possible to reduce the workload and cost of inspection.


1980 ◽  
Vol 12 (4) ◽  
pp. 191-195 ◽  
Author(s):  
William J. Zimmer ◽  
Chiu-Yung Tai

2020 ◽  
Vol 19 ◽  

This paper presents the CSP-2L continuous sampling plan, which is designed for product inspectionon two independent production lines at the same time. The purpose of the CSP-2L is to improve the CSP-1-2Lin order to reduce the number of defective products that have passed without being inspected during thetemporary inspection stop, so the quality of the products is better. Therefore, if the manufacturer who uses theCSP-2L plan to inspect the production lines then resulting in higher quality of the products than the CSP-1-2L.This presentation includes the product inspection procedures and the formulas for performance measures suchas average total fraction inspected (ATFI), average total outgoing quality (ATOQ), and average total outgoingquality limit (ATOQL) which are carried out using a Markov chain. The formulas for performance measures ofthe CSP-2L have been tested to be accurate. When defined, the probability of a unit produced by the processbeing nonconforming of line 1 and line 2 are equal (p1 = p2 = p = 0.005, 0.015 and 0.035), the clearance numberof line 1 and line 2 are equal (i1 = i2 = 10, 20, 30, 40 and 50), the sampling fraction of line 1 and line 2 are equal(f1 = f2 =12and13) and the number of units to be found when inspection of line 1 and line 2 are in the phaseof sampling inspection at the same time (m = i1 and 2i1). Moreover, the ATOQ values from the CSP-2L and theCSP-1-2L plans were compared. The results showed that, the formulas for performance measures are accurateand in the case of p, the levels are low and moderate, the ATOQ of the CSP-2L are less than those of theCSP-1-2L in all cases. But in the case of p is at a high level, the ATOQ of the CSP-2L is less than those of theCSP-1-2L for some cases of i.


Sign in / Sign up

Export Citation Format

Share Document