Lot streaming in a two-stage assembly hybrid flow shop scheduling problem with a work shift constraint
2016 ◽
Vol 33
(7)
◽
pp. 459-471
◽
Keyword(s):
2013 ◽
Vol 70
(1-4)
◽
pp. 501-514
◽
2013 ◽
Vol 28
(3)
◽
pp. 358-368
◽
Keyword(s):
2015 ◽
Vol 54
(4)
◽
pp. 963-983
◽
Keyword(s):
2018 ◽
Vol 10
(3)
◽
pp. 979-990
◽
Keyword(s):
2020 ◽
Vol 38
(3)
◽
pp. 3189-3199
◽
Keyword(s):
A new complexity proof for the two-stage hybrid flow shop scheduling problem with dedicated machines
2009 ◽
Vol 48
(5)
◽
pp. 1531-1538
◽
Keyword(s):
2013 ◽
Vol 40
(4)
◽
pp. 1064-1075
◽
Keyword(s):
2019 ◽
Vol 58
(8)
◽
pp. 2283-2314
◽