Multi-job lot streaming to minimize the weighted completion time in a hybrid flow shop scheduling problem with work shift constraint

2013 ◽  
Vol 70 (1-4) ◽  
pp. 501-514 ◽  
Author(s):  
Mohsen Nejati ◽  
Iraj Mahdavi ◽  
Reza Hassanzadeh ◽  
Nezam Mahdavi-Amiri ◽  
MohamadSailm Mojarad
2012 ◽  
Vol 252 ◽  
pp. 354-359
Author(s):  
Xin Min Zhang ◽  
Meng Yue Zhang

A main-branch hybrid Flow shop scheduling problem in production manufacturing system is studied. Under the premise of JIT, targeting of smallest cost, a Flow-Shop production line scheduling model is built in cycle time of buffer. Two stages Quantum Genetic Algorithm (QGA) is proposed. By the results of numerical example, the effective and advantageous of QGA was shown.


Sign in / Sign up

Export Citation Format

Share Document