Aimed at the real-time request of dynamic scheduling to product resource, an optimization method of parallel dynamic chain real-time available resources was put forward. Proceed from real-time tracing of resource information influencing scheduling tasks dynamic property, established a resource informations real-time tracing back and optimization model, which used module and parallel process mechanism to different kinds of real-time traced back resource information. The mechanism processed global dynamic feedback tracing for every module and optimized available resources primarily, on this basis, graded the primary available resources and gave a real-time candidate resource set. Through one example of one gear production scheduling, the methods validity was tested.