Integrated model of productivity and quality in serial production lines with repairs: Performance evaluation and bottleneck identification
2001 ◽
Vol 7
(6)
◽
pp. 543-578
◽
1994 ◽
Vol 32
(12)
◽
pp. 2897-2914
◽
1996 ◽
Vol 34
(5)
◽
pp. 1279-1291
◽
Keyword(s):
2008 ◽
Vol 5
(2)
◽
pp. 97-103
◽
Keyword(s):
1990 ◽
Vol 28
(6)
◽
pp. 1163-1182
◽
Keyword(s):
2018 ◽
Vol 57
(8)
◽
pp. 2247-2262
◽