A simple formula for estimating throughput of serial production lines with variable processing times and limited buffer capacity
1990 ◽
Vol 28
(6)
◽
pp. 1163-1182
◽
Keyword(s):
2006 ◽
Vol 2006
◽
pp. 1-24
◽
2002 ◽
Vol 40
(3)
◽
pp. 601-624
◽
2009 ◽
Vol 34
(2)
◽
pp. 122
◽
2008 ◽
Vol 5
(2)
◽
pp. 97-103
◽
Keyword(s):
2018 ◽
Vol 57
(8)
◽
pp. 2247-2262
◽