LQG/LTR control system design for a low-pressure feedwater heater train with time delay
2017 ◽
Vol 137
(2)
◽
pp. 87-94
Keyword(s):
2013 ◽
Vol 46
(11)
◽
pp. 472-476
◽
2019 ◽
Vol 26
(12)
◽
pp. 3351-3358
Keyword(s):
Keyword(s):
1997 ◽
Vol 7
(1)
◽
pp. 65-73
◽
Keyword(s):
2014 ◽
pp. 257-270
◽
Keyword(s):
1998 ◽
Vol 212
(1)
◽
pp. 37-48
◽
Keyword(s):