Solving for Power system economic dispatch with wind power integration based on chance-constrained programming

Author(s):  
Yaming Ren
Energies ◽  
2019 ◽  
Vol 12 (9) ◽  
pp. 1604
Author(s):  
Krešimir Fekete ◽  
Srete Nikolovski ◽  
Zvonimir Klaić ◽  
Ana Androjić

Stochastic production from wind power plants imposes additional uncertainty in power system operation. It can cause problems in load and generation balancing in the power system and can also cause congestion in the transmission network. This paper deals with the problems of congestion in the transmission network, which are caused by the production of wind power plants. An optimization model for corrective congestion management is developed. Congestions are relieved by re-dispatching several cascaded hydropower plants. Optimization methodology covers the optimization period of one day divided into the 24 segments for each hour. The developed optimization methodology consists of two optimization stages. The objective of the first optimization stage is to obtain an optimal day-ahead dispatch plan of the hydropower plants that maximizes profit from selling energy to the day-ahead electricity market. If such a dispatch plan, together with the wind power plant production, causes congestion in the transmission network, the second optimization stage is started. The objective of the second optimization stage is the minimization of the re-dispatching of cascaded hydropower plants in order to avoid possible congestion. The concept of chance-constrained programming is used in order to consider uncertain wind power production. The first optimization stage is defined as a mixed-integer linear programming problem and the second optimization stage is defined as a quadratic programming (QP) problem, in combination with chance-constrained programming. The developed optimization model is tested and verified using the model of a real-life power system.


2008 ◽  
Vol 78 (6) ◽  
pp. 1069-1079 ◽  
Author(s):  
Poul Sørensen ◽  
Ian Norheim ◽  
Peter Meibom ◽  
Kjetil Uhlen

2014 ◽  
Vol 986-987 ◽  
pp. 622-629
Author(s):  
Tian Long Shao ◽  
Jian Zhang ◽  
Xu Nan Zhao

As a kind of renewable clean energy, the constant access of wind power to power grids is bound to have a great impact on the power system. Based on the grid structure in Fuxin, this paper will state the difficulty of peak regulation and the matter of wasting wind power caused by the large-scale wind power integration and put forward some reasonable methods for using the wasting wind power in the heating in winter. The relevant results indicate that capacity of local consumption of wasting wind power can be improved. Under the circumstances, it can be conductive to solve the problem of wasting wind power results from the difficulty of peak regulation as well as inspire the power system planners.


IEEE Access ◽  
2018 ◽  
Vol 6 ◽  
pp. 57400-57413 ◽  
Author(s):  
Yumin Zhang ◽  
Xueshan Han ◽  
Bo Xu ◽  
Mingqiang Wang ◽  
Pingfeng Ye ◽  
...  