scholarly journals A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

2014 ◽  
Vol 2014 ◽  
pp. 1-9 ◽  
Author(s):  
Yongyi Shou ◽  
Wenwen Xiang ◽  
Ying Li ◽  
Weijian Yao

A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

IEEE Access ◽  
2021 ◽  
pp. 1-1
Author(s):  
Kyle Robert Harrison ◽  
Saber Elsayed ◽  
Ivan L. Garanovich ◽  
Terence Weir ◽  
Michael Galister ◽  
...  

2021 ◽  
pp. 89-123
Author(s):  
Kyle Robert Harrison ◽  
Saber M. Elsayed ◽  
Ivan L. Garanovich ◽  
Terence Weir ◽  
Sharon G. Boswell ◽  
...  

Author(s):  
Walter J. Gutjahr ◽  
Stefan Katzensteiner ◽  
Peter Reiter ◽  
Christian Stummer ◽  
Michaela Denk

2021 ◽  
Vol 27 (2) ◽  
pp. 493-510
Author(s):  
Samaneh Zolfaghari ◽  
Seyed Meysam Mousavi ◽  
Jurgita Antuchevičienė

This paper presents a new optimization model and a new interval type-2 fuzzy solution approach for project portfolio selection and scheduling (PPSS) problem, in which split of projects and re-execution are allowable. Afterward, the approach is realized as a multi-objective optimization that maximizes total benefits of projects concerning economic concepts by considering the interest rate and time value of money and minimizes the tardiness value and total number of interruptions of chosen projects. Besides, budget and resources limitation, newfound relations are proposed to consider dependency relationships via a synergy among projects to solve PPSS problem hiring interval type-2 fuzzy sets. For validation of the model, numerical instances are provided and solved by a new extended procedure based on fuzzy optimistic and pessimistic viewpoints regarding several situations. In the end, their results are studied. The results show that it is more beneficial when projects are allowed to be split.


Sign in / Sign up

Export Citation Format

Share Document