Integrated Scheduling Algorithm Based on Dynamic Essential Short Path by Device Driver

2013 ◽  
Vol 10 (4) ◽  
pp. 1075-1084
Author(s):  
Zhiqiang Xie
Author(s):  
Yingchun Xia ◽  
Zhiqiang Xie ◽  
Yu Xin ◽  
Xiaowei Zhang

The customized products such as electromechanical prototype products are a type of product with research and trial manufacturing characteristics. The BOM structures and processing parameters of the products vary greatly, making it difficult for a single shop to meet such a wide range of processing parameters. For the dynamic and fuzzy manufacturing characteristics of the products, not only the coordinated transport time of multiple shops but also the fact that the product has a designated output shop should be considered. In order to solve such Multi-shop Integrated Scheduling Problem with Fixed Output Constraint (MISP-FOC), a constraint programming model is developed to minimize the total tardiness, and then a Multi-shop Integrated Scheduling Algorithm (MISA) based on EGA (Enhanced Genetic Algorithm) and B&B (Branch and Bound) is proposed. MISA is a hybrid optimization method and consists of four parts. Firstly, to deal with the dynamic and fuzzy manufacturing characteristics, the dynamic production process is transformed into a series of time-continuous static scheduling problem according to the proposed dynamic rescheduling mechanism. Secondly, the pre-scheduling scheme is generated by the EGA at each event moment. Thirdly, the jobs in the pre-scheduling scheme are divided into three parts, namely, dispatched jobs, jobs to be dispatched, and jobs available for rescheduling, and at last, the B&B method is used to optimize the jobs available for rescheduling by utilizing the period when the dispatched jobs are in execution. Google OR-Tools is used to verify the proposed constraint programming model, and the experiment results show that the proposed algorithm is effective and feasible.


Author(s):  
Yilong Gao ◽  
Zhiqiang Xie ◽  
Qing Jia ◽  
Xu Yu

Aiming at the distributed integrated scheduling of complex products with tree structure, a memetic algorithm-based distributed integrated scheduling algorithm is proposed. Based on the framework of the memetic algorithm, the algorithm uses a distributed estimation algorithm for global search and performs a local search strategy based on the critical operation set for the current optimal solution obtained in each evolutionary generation. A bi-chain-based individual representation method is presented and a simple greedy insertion-based decoding method is given; two position-based probability models are built, which are used to describe the distribution of the operation priority and factory assignment, respectively. Based on the designed probability models, two learning-based updating mechanisms and an improved sampling method are given, which ensures that the population evolves towards a promising region. In order to enhance the searchability for the superior solutions, nine disturbance operators based on the critical operation set are presented. The parameters are determined by the design-of-experiment (DOE) test, and the effectiveness of the proposed algorithm is verified by comparative experiments.


2020 ◽  
Vol 56 (4) ◽  
pp. 246
Author(s):  
GUO Weifei ◽  
LEI Qi ◽  
SONG Yuchuan ◽  
Lü Xiangfei ◽  
LI Lei

2021 ◽  
Vol 1748 ◽  
pp. 032030
Author(s):  
Xinkun Wang ◽  
Yuchuan Song ◽  
Yuji Zou ◽  
Weifei Guo ◽  
Yi Wang

2011 ◽  
Vol 37 (3) ◽  
pp. 371-379 ◽  
Author(s):  
Zhi-Qiang XIE ◽  
Yu-Zheng TENG ◽  
Jing YANG

Sign in / Sign up

Export Citation Format

Share Document