Techno-economic analysis of a 500 MWe supercritical coal-based thermal power plant with solar assisted MEA-based CO2 capture
1999 ◽
Vol 40
(6)
◽
pp. 403
◽
Keyword(s):
2017 ◽
Vol 39
(6)
◽
pp. 562-572
◽
2011 ◽
Vol 354-355
◽
pp. 401-405
Keyword(s):
2018 ◽
Vol 171
◽
pp. 222-240
◽
Keyword(s):
2016 ◽
Vol 03
(03)
◽
pp. 36-41
◽
Keyword(s):