Reentrant hybrid flow shop scheduling problem with non-anticipatory sequence-dependent setup time

Author(s):  
Lu Chen ◽  
Jinfeng Wang ◽  
Yi Zhu
2011 ◽  
Vol 339 ◽  
pp. 332-335 ◽  
Author(s):  
Parinya Kaweegitbundit

This paper considers flow shop scheduling problems with sequence dependent setup time. The makespan criterion has been considered. In this paper presented a comparison of three heuristics for solves this problem. The memetic algorithm, genetic algorithm and NEH heuristic have been compared. In the experimental, the result from memetic algorithm is maximum the best solution. Therefore, the MA heuristic outperforms other heuristic.


2021 ◽  
pp. 1-15
Author(s):  
Deming Lei ◽  
Bingjie Xi

Distributed scheduling has attracted much attention in recent years; however, distributed scheduling problem with uncertainty is seldom considered. In this study, fuzzy distributed two-stage hybrid flow shop scheduling problem (FDTHFSP) with sequence-dependent setup time is addressed and a diversified teaching-learning-based optimization (DTLBO) algorithm is applied to optimize fuzzy makespan and total agreement index. In DTLBO, multiple classes are constructed and categorized into two types according to class quality. Different combinations of global search and neighborhood search are used in two kind of classes. A temporary class with multiple teachers is built based on Pareto rank and difference index and evolved in a new way. Computational experiments are conducted and results demonstrate that the main strategies of DTLBO are effective and DTLBO has promising advantages on solving the considered problem.


Sign in / Sign up

Export Citation Format

Share Document