Implementing lean through value stream mapping for productivity improvement: a case study of link frame mechanical press manufacturing industry

Author(s):  
Gurraj Singh ◽  
Rohit Sharma ◽  
Kashmir Singh Ghatorha ◽  
Parveen Sharma
2019 ◽  
Vol 11 (3) ◽  
pp. 493-514 ◽  
Author(s):  
Aatish Kumar Mishra ◽  
Ayush Sharma ◽  
Moraldeepsingh Sachdeo ◽  
Jayakrishna K.

Purpose The main purpose of this paper is to analyze the current state of a bonnet-manufacturing industry and to optimize the process by designing a future state map using simulation approach. Design/methodology/approach The case study approach has been proposed to highlight the applicability of value stream mapping (VSM) in an Indian bonnet manufacturing organization. The methodology used relies on formulation of VSM being the main tool used to identify the opportunities for classifying and eliminating bottlenecks with the help of various lean techniques. A contrast of present and past scenarios is highlighted to underscore the importance of using VSM with ARENA simulation. Findings Application of the proposed simulation approach has helped the organization reduce the cycle time significantly by 30 per cent over the entire production time. The average number of work-in-progress pieces has also decreased by about ten. In addition, enhancements have been seen with respect to ecological parameters, e.g. carbon footprint has been reduced to 83.7 percent across the process. Research limitations/implications The proposed approach of using a simulation-based VSM helps in reducing the time involved in traditional VSM method. This approach is also easy to implement at any organizational level. Practical implications It is believed that this paper will aid not just industrialists but also academic professionals to appreciate the role of simulation using ARENA in helping them understand how to attack the various problems faced by industries. The results of the study indicate that by applying this methodology, there will be a reduction not only in cost but also in environmental impacts. Originality/value The paper incorporates a real case study, which shows application of VSM for implementing lean principles in a bonnet-manufacturing industry. Break-even analysis presented fills the gap which previous literatures have been missing.


Author(s):  
V. Saravanan ◽  
S. Nallusamy ◽  
Abraham George

Productivity is an important parameter for all small and medium scale manufacturing industries. Lean manufacturing emerged as production strategy capable of increasing productivity by identifying and eliminating non value added activities. This article deals with productivity improvement in a pre-assembly line of gearbox manufacturing company with a case study using lean concepts like process flow chart, process Gantt chart and time study. This paper illustrates using a case study on how a value stream mapping has to be carried out in a planet carrier pre-assembly line. Value stream mapping and work standardization are the key tools used in lean manufacturing and lean transformation. It makes the process smoother, helps in reduction of lead time and ultimately increasing the productivity. From the observed results it was found that, the productivity has been increased from 7 pieces to 10 pieces in the first step assembly when the proposed VSM was implemented. The second step processing time was reduced by the execution of proposed value stream mapping with TAKT time of 126 minutes and 165 minutes of processing time for demand of 10 pieces were achieved and the overall processing time has been reduced by about 24%.


2021 ◽  
Author(s):  
Sam Ataei

For many years, productivity improvement through value stream mapping and simulation has been studied in manufacturing industry where the flow of materials is visible and the work can be standardized. In recent years, the service industry has become a new arena for lean operations. Within the service industry, client-based companies have distinct challenges in streamlining their process, as it may not be feasible to standardize the needs of different clients. This thesis focuses on a case from a client-based company in the area of graphic communications and brand point management services. The thesis examines the application of lean principles towards a set of subjective processes and provides directions for improving productivity. Some lean methods utilized in the study include creating process flows, conducting operator interviews to back-up the process flow, collecting data such as processing time and creating a detailed values stream map of the retail packaging process in order to analyze any necessary areas of improvement. Value stream mapping has been used to identify the areas where the non-value-added tasks can be reduced, and simulation models have been used to imitate and predict the company's different scenarios in dealing with bottlenecks, different kinds of wastes, and to assess potential areas for improvements. The analysis of results indicates that it is necessary to have two different streams of the processes; one for a team-based job and another one for a non-team-based job. The proper touch points from each department have been found and value-added and non-value added times have been determined in order to create the current-state. Furthermore, future-states have been created with some recommendations kept in mind to validate the time savings. The results have been verified through a simulation analysis.


Author(s):  
S. Nallusamy ◽  
M.A. Adil Ahamed

Value stream mapping has the reputation of uncovering waste in manufacturing, production and business process. This helps in identifying and removing or streaming value added steps and eliminating non value added steps. In this study the process was analyzed to find an opportunity to drastically reduce the number of actions and to simplify the same. By reducing waste the proportion of value adding time increases in the whole process and the process throughput speed could also be increased. This makes the redesigned process more effective and more efficient. The reengineered process was flow charted in its future state with process steps and information flows re-engineering, simplified and economized. The current layout was analysed to identify and eliminate the non value added activities through lean tools like 5S, VSM and line balancing in a manufacturing industry. From the observed results, it was concluded that the non value added time could be reduced by about 13% while the process cycle efficiency could be increased by about 10%. Virtual simulation was conducted to verify and validate the existing situation as well as to propose the results and the effectiveness of lean principles in a systematic manner with the help of ARENA.


2018 ◽  
Vol 220 ◽  
pp. 02005
Author(s):  
Abdillah Arif Nasution ◽  
Ikhsan Siregar ◽  
Anizar ◽  
Tigor Hamonangan Nasution ◽  
Khalida Syahputri ◽  
...  

This research was conducted in manufacturing industry, so this research is based on case study application. This research serves to reduce waste in the industry when making a product. This study categorizes value-added work and which work has no added value. And it is measurable and has value, so it can be evaluated in the future. Later this will be poured or depicted on a map called Value stream mapping. This is a tool from Lean Manufacturing. Lean manufacturing is useful for analysing and reducing non value-added activities, value stream mapping analysis tools, 5L1H process mapping activities, and 5 why tools. From the results of this study obtained the efficiency of the process cycle and total estimation of the improvement of the lead time. This calculation can be an evaluation material for the company.


Author(s):  
S. Nallusamy ◽  
V. Saravanan

The main aim of this study is to achieve the maximum productivity in an assembly line of a valve manufacturing industry through the implementation of different lean tools to minimize the production time. The existing manufacturing data were collected and interpret the information’s for identifying the gaps for productivity improvement. For obtaining the production line performance we shall introduce a solution after finding the problemswhich affects the lead time. In this research, an attempt was made to introduce a new fixture with appropriate lean methods by focusing on value stream mapping, kaizen etc to eliminate different kinds of lead times consuming phases in the overall process. Designing a fixture for the process is also done in Kaizen, in order to exclude the sub operations. After execution of various lean tools the total cycle time was reduced about 10.49 minutes and the productivity was improved about 20% by eliminating all those non value added activities in the operations to meet the customer demand.