scholarly journals A Study of the Functional Mechanism of Petrochemical Engineering Construction Project Management

2014 ◽  
Vol 1 (2) ◽  
pp. 129 ◽  
Author(s):  
Ji-ming Wang
2019 ◽  
Vol 4 (1) ◽  
pp. 3-5
Author(s):  
Mei Hong ◽  

With the development of society, people have higher and higher requirements for the environment. The construction of modern garden engineering can improve the ecological environment to a great extent and play an important role in promoting the construction of ecological China. Based on this, starting with the characteristics of garden engineering construction, this paper analyzes the problems existing in garden engineering construction project management, and gives some countermeasures to strengthen construction project management, hoping to provide reference for garden construction project management.


2014 ◽  
Vol 1056 ◽  
pp. 142-145
Author(s):  
Lei Liu

The civil engineering construction is a very complicated production activities. In the whole construction process need to consume a large amount of manpower, consume a large amount of materials, use a lot of equipment, also need to deal with complex technical problems a lot. So this is for the civil engineering construction project management have strict requirements. This paper from the quality control, schedule control, cost control three aspects of the civil engineering construction project management analysis. Quality control Construction quality is the foundation of project management work, is the basic requirement of the construction of the project. Have important influence on the quality of the whole construction quality of engineering quality control. Because the civil engineering construction comprises a plurality of procedures, quality control is usually divided in time for the preparation of construction quality control, the quality control of construction process and quality control of completion and acceptance of three stages. Preparation of construction quality control of the main content is: each enterprise carefully check to participate in the project entity construction qualification, including professional subcontracting subcontracting, materialsand material suppliers; according to the basic principles of quality management, review project quality plan, quality requirements, implementationplan, including examination, treatment and other sectors to establish quality control preliminary scheme;, once appear quality problem, can quickly take thepreliminary scheme, guarantee the quality of the whole project. Figure 1 Quality process control before, during and after the event.


2019 ◽  
Vol 4 (1) ◽  
pp. 17-18
Author(s):  
Qiang Liu ◽  

Improve the quality of personnel, optimize the electric power construction process, standardize the engineering bidding process, strengthen the engineering quality management, constantly improve the project management level, to ensure that electric power enterprises obtain higher economic and social benefits of project construction.


Sign in / Sign up

Export Citation Format

Share Document