A job schedule ensuring the exact minimum of total weighted tardiness can be found with the respective integer linear programming problem model, in which the infinity showing that the respective states are either forbidden or impossible is substituted with a sufficiently great positive integer. An open question is whether the substitute can be selected so that the computation time would be decreased. Thus, it is ascertained that, whichever job lengths and its priority weights are, substituting the infinity with just “a sufficiently great positive integer” is never recommended. To decrease the computation time on average, it is strongly recommended to select the infinity substitute as multiple maximum over finite decision variable weights in the exact model. It is sufficient to take 2 to 5 such maxima as the infinity substitute. However, the shortened computation time is not guaranteed for solving a single or few scheduling problems. It is only an expected benefit, which builds up as a few hundred scheduling problems are solved at least.

Author(s):  
Vadym V. Romanuke

Background. In preemptive job scheduling, total weighted tardiness minimization is commonly reduced to solving a combinatorial problem, which becomes practically intractable as the number of jobs and the numbers of their processing periods increase. To cope with this challenge, heuristics are used. A heuristic, in which the decisive ratio is the weighted reciprocal of the maximum of a pair of the remaining processing period and remaining available period, is closely the best one. However, the heuristic may produce schedules of a few jobs whose total weighted tardiness is enormously huge compared to the real minimum. Therefore, this heuristic needs further improvements, one of which already exists for jobs without priority weights with a sorting approach where remaining processing periods are minimized. Three other sorting approaches still can outperform it, but such exceptions are quite rare. Objective. The goal is to determine the influence of the four sorting approaches and try to select the best one in the case where jobs have their priority weights. The heuristic will be applied to tight-tardy progressive idling-free 1-machine preemptive scheduling, where the release dates are given in ascending order starting from 1 to the number of jobs, and the due dates are tightly set after the release dates. Methods. To achieve the said goal, a computational study is carried out with applying each of the four heuristic approaches to minimize total weighted tardiness. For this, two series of 4151500 scheduling problems are generated. In the solution of a scheduling problem, a sorting approach can “win” solely or “win” in a group of approaches, producing the heuristically minimal total weighted tardiness. In each series, the distributions of sole-and-group “wins” are ascertained. Results. The sole “wins” and non-whole-group “wins” are rare: the four sorting approaches produce schedules with the same total weighted tardiness in over 98.39 % of scheduling problems. Although the influence of these approaches is different, it is therefore not really significant. Each of the sorting approaches has heavy disadvantages leading sometimes to gigantic inaccuracies, although they occur rarely. When the inaccuracy occurs to be more than 30 %, this implies that 3 to 9 jobs are scheduled. Conclusions. Unlike the case when jobs do not have their priority weights, it is impossible to select the best sorting approach for the case with job priority weights. Instead, a hyper-heuristic comprising the sorting approaches (i. e., the whole group, where each sorting is applied) may be constructed. If a parallelization can be used to process two or even four sorting routines simultaneously, the computation time will not be significantly affected.


2019 ◽  
Vol 24 (2) ◽  
pp. 150-160 ◽  
Author(s):  
Vadim Romanuke

Abstract Two possibilities of obtaining the minimal total weighted tardiness in tight-tardy single machine preemptive idling-free scheduling are studied. The Boolean linear programming model, which allows obtaining the exactly minimal tardiness, becomes too time-consuming as either the number of jobs or numbers of job parts increase. Therefore, a heuristic based on remaining available and processing periods is used instead. The heuristic schedules 2 jobs always with the minimal tardiness. In scheduling 3 to 7 jobs, the risk of missing the minimal tardiness is just 1.5 % to 3.2 %. It is expected that scheduling 12 and more jobs has at the most the same risk or even lower. In scheduling 10 jobs without a timeout, the heuristic is almost 1 million times faster than the exact model. The exact model is still applicable for scheduling 3 to 5 jobs, where the averaged computation time varies from 0.1 s to 1.02 s. However, the maximal computation time for 6 jobs is close to 1 minute. Further increment of jobs may delay obtaining the minimal tardiness at least for a few minutes, but 7 jobs still can be scheduled at worst for 7 minutes. When scheduling 8 jobs and more, the exact model should be substituted with the heuristic.