ScienceGate
Advanced Search
Author Search
Journal Finder
Blog
Sign in / Sign up
ScienceGate
Search
Author Search
Journal Finder
Blog
Sign in / Sign up
Phase 2 confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
Mapping Intimacies
◽
10.2172/569088
◽
1998
◽
Author(s):
Keyword(s):
Phase 2
◽
Oak Ridge
◽
East Fork Poplar Creek
Download Full-text
Related Documents
Cited By
References
Rank kriging for characterization of mercury contamination at the East Fork Poplar Creek, Oak Ridge, Tennessee
Environmetrics
◽
10.1002/env.537
◽
2002
◽
Vol 13
(5-6)
◽
pp. 679-691
◽
Cited By ~ 2
Author(s):
Ashok K. Singh
◽
M. M. A. Ananda
Keyword(s):
Mercury Contamination
◽
Oak Ridge
◽
East Fork Poplar Creek
Download Full-text
Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee
10.2172/409873
◽
1996
◽
Author(s):
Keyword(s):
Oak Ridge
◽
East Fork Poplar Creek
◽
Sampling And Analysis Plan
Download Full-text
Calendar year 1996 annual groundwater monitoring report for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee
10.2172/527469
◽
1997
◽
Author(s):
◽
Keyword(s):
Groundwater Monitoring
◽
Department Of Energy
◽
Oak Ridge
◽
East Fork Poplar Creek
◽
Monitoring Report
◽
The U.S
Download Full-text
Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek
10.2172/10102775
◽
1993
◽
Cited By ~ 8
Author(s):
R.L. Hinzman
◽
S.M. Adams
◽
M.C. Black
Keyword(s):
Biological Monitoring
◽
Oak Ridge
◽
East Fork Poplar Creek
Download Full-text
Quality assurance/quality control summary report on phase 2 of the Clinch River remedial investigation at the Oak Ridge Reservation, Oak Ridge, Tennessee
10.2172/451306
◽
1996
◽
Author(s):
S.K. Holladay
◽
H.M. Anderson
◽
S.B. Benson
◽
M.S. Bevelhimer
◽
C.C. Brandt
◽
...
Keyword(s):
Quality Control
◽
Quality Assurance
◽
Phase 2
◽
Summary Report
◽
Oak Ridge
◽
Clinch River
Download Full-text
Groundwater Protection Program Calendar Year 1998 Evaluation of Groundwater Quality Data for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee
10.2172/14291
◽
1999
◽
Author(s):
Keyword(s):
Groundwater Quality
◽
Groundwater Protection
◽
Department Of Energy
◽
Quality Data
◽
Oak Ridge
◽
East Fork Poplar Creek
◽
The U.S
Download Full-text
Phase 2 focused feasibility study report for the reduction of mercury in plant effluent project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
10.2172/132697
◽
1994
◽
Author(s):
Keyword(s):
Feasibility Study
◽
Phase 2
◽
Oak Ridge
◽
Study Report
Download Full-text
Remedial investigation work plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
10.2172/446346
◽
1996
◽
Author(s):
Keyword(s):
Oak Ridge
◽
Work Plan
◽
East Fork Poplar Creek
Download Full-text
Storm water control plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee
10.2172/432436
◽
1996
◽
Author(s):
Keyword(s):
Storm Water
◽
Water Control
◽
Control Plan
◽
Oak Ridge
◽
East Fork Poplar Creek
Download Full-text
Quality Assurance Plan for the Upper East Fork Poplar Creek Characterization Area, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee
10.2172/432817
◽
1996
◽
Author(s):
Keyword(s):
Quality Assurance
◽
Oak Ridge
◽
East Fork Poplar Creek
Download Full-text
Sign in / Sign up
Close
Export Citation Format
Close
Share Document
Close