A Novel Design of An Air Conditioner Water Heater

Author(s):  
D. T. Chen ◽  
J. Y. Lin ◽  
Y. K. Chuah ◽  
L. J. Fang
2007 ◽  
Vol 48 (4) ◽  
pp. 1222-1237 ◽  
Author(s):  
P. Techarungpaisan ◽  
S. Theerakulpisut ◽  
S. Priprem
Keyword(s):  

2017 ◽  
Vol 120 ◽  
pp. 393-401 ◽  
Author(s):  
Jiankai Dong ◽  
Hui Li ◽  
Yang Yao ◽  
Yiqiang Jiang ◽  
Xinran Zhang

2011 ◽  
Vol 467-469 ◽  
pp. 549-553
Author(s):  
Hong Song Hu ◽  
Fang Wang ◽  
Jian Zhong Yu ◽  
Wu Hao

This paper analysis on the design and the test of an air-conditioner hot water combined unit using environmental friendly refrigerant R407C. Firstly the research status of the system is elaborated for air-source heat pump water heater simply. Then the principle and structure are described on an air-conditioner heat pump followed by a water heater at different running modes and different operation conditions. The hot water experiments of the unit in three seasons have been tested and researched in a multi-functional environmental chamber. Some analysis of the unit’s thermodynamic performance is carried out from the test data for improving such kind of machine afterward.


2003 ◽  
Vol 23 (5) ◽  
pp. 581-592 ◽  
Author(s):  
Jie Ji ◽  
Tin-tai Chow ◽  
Gang Pei ◽  
Jun Dong ◽  
Wei He

2020 ◽  
Vol 10 (18) ◽  
pp. 6176
Author(s):  
Zhiping Cheng ◽  
Xiang Li ◽  
Zhongwen Li ◽  
Jikai Si ◽  
Shuai Xu ◽  
...  

Building integrated photovoltaic (BIPV) is one of the most efficient ways to utilize renewable energy in buildings. However, the stochastic characteristic of PV power generation and load challenges the optimal dispatch of the BIPV. This paper proposes an optimal scheduling strategy of BIPV microgrid considering virtual energy storage (VES), which intends to further improve the operating economy of a BIPV microgrid. Firstly, existing research findings and gaps in this research area were analyzed. Then, the mathematical model of each unit in the system was created, meanwhile, the air conditioner-based VES (ACVES) model and electric water heater-based VES (EWHVES) model are built by exploiting the heat/cold storage capability of building and the electric water heater, respectively. Next, the optimal scheduling model considering the VES is designed. Finally, the optimal scheduling model is solved by CPLEX to obtain the optimal scheduling strategy that reduces the operating cost of the system. Simulation results demonstrate that the proposed strategy can reduce the operating cost of the system. Furthermore, the VES shows the potential to replace the battery energy storage system.


Sign in / Sign up

Export Citation Format

Share Document