Aplikasi Jaringan Saraf Tiruan untuk Prediksi Beban Puncak di Kabupaten Manokwari
Keyword(s):
The usage of electrical power in Manokwari has increased annually. Electrical generation is needed to be predicted in order to know its reliability. Artificial neural networks are used in many applications and it was used to predict peak load in Manokwari. The result shows that in December 2011, peak load in Manokwari is about 10809.18kW and 10812.15 kW for online and offline prediction respectively. This condition shows that as long as no generator set is overhauled, the electrical generation unit in Manokwari can handle the peak load until December 2011.