Analysis and Research on Construction Process Control in Urban Construction Project Management

2021 ◽  
2021 ◽  
Vol 2 (2) ◽  
Author(s):  
Yongjun Luo

The construction project serves as one of the most important projects in the construction industry. The high cost and the particularity in the implementation generate high risks in the investment and construction process. Over the years, the development of construction project management methods has promoted the management of risk factors. This paper reviews the suggestions of risk management of follow-up audit in construction stage and evaluates its application in construction projects.


2014 ◽  
Vol 1056 ◽  
pp. 142-145
Author(s):  
Lei Liu

The civil engineering construction is a very complicated production activities. In the whole construction process need to consume a large amount of manpower, consume a large amount of materials, use a lot of equipment, also need to deal with complex technical problems a lot. So this is for the civil engineering construction project management have strict requirements. This paper from the quality control, schedule control, cost control three aspects of the civil engineering construction project management analysis. Quality control Construction quality is the foundation of project management work, is the basic requirement of the construction of the project. Have important influence on the quality of the whole construction quality of engineering quality control. Because the civil engineering construction comprises a plurality of procedures, quality control is usually divided in time for the preparation of construction quality control, the quality control of construction process and quality control of completion and acceptance of three stages. Preparation of construction quality control of the main content is: each enterprise carefully check to participate in the project entity construction qualification, including professional subcontracting subcontracting, materialsand material suppliers; according to the basic principles of quality management, review project quality plan, quality requirements, implementationplan, including examination, treatment and other sectors to establish quality control preliminary scheme;, once appear quality problem, can quickly take thepreliminary scheme, guarantee the quality of the whole project. Figure 1 Quality process control before, during and after the event.


Sign in / Sign up

Export Citation Format

Share Document