Discussion on the Role of Construction Process Control in the Management of Urban Construction Project

2021 ◽  
2011 ◽  
Vol 120 ◽  
pp. 385-388 ◽  
Author(s):  
Chang Bing Chen ◽  
Duo Ci Wang

Engineering construction counterclaim occupy a very important position in the construction project cost management, is also a key part in engineering settlement audit. This paper introduces the properties, claim evidence, procedures, cost calculation and management etc. To safeguard the lawful rights and interests of all parties construction, to promote the healthy development of the construction industry.


2021 ◽  
Vol 13 (8) ◽  
pp. 4513
Author(s):  
Summaira Malik ◽  
Muhammad Taqi ◽  
José Moleiro Martins ◽  
Mário Nuno Mata ◽  
João Manuel Pereira ◽  
...  

The success of a construction project is a widely discussed topic, even today, and there exists a difference of opinion. The impact of communication and conflict on project success is an important, but least addressed, issue in literature, especially in the case of underdeveloped countries. Miscommunication and conflict not only hinder the success of a project but also may lead to conflicts. The focus of this paper was to examine the impact of communication on project success with the mediating role of conflict. By using SPSS, demographics, descriptive statistics and correlation were determined. Smart PLS version 3.0 was used for confirmatory factor analysis (CFA), internal accuracy and validity estimates, hypothesis checking and mediation testing. The results showed that formal communication has a negative impact on the success of a construction project, resulting in conflicts among project team members, whereas informal communication and communication willingness have a positive impact on project success because people tend to know each other, and trust is developed. Task, process and relationship conflicts were used as mediating variables. It was found that task conflict effects the relations positively because project team members suggest different ways to do a certain task, and, hence, project success is achieved. On the contrary, process conflict and relationship conflict have a negative impact on communication and project success. Both of these conflicts lead to miscommunication, and project success is compromised. Hence, it is the responsibility of the project manager to enhance communication among project team members and to reduce the detrimental effects of process and relationship conflict on project success.


2021 ◽  
Vol 13 (5) ◽  
pp. 2678
Author(s):  
Nicolas Brusselaers ◽  
Koen Mommens ◽  
Cathy Macharis

The urban built environment concentrates due to the growing urbanization trend, triggering construction and renovation works in urban areas. Although construction works often revitalize cities upon completion, the associated logistics activities engender a significant financial and environmental footprint if not handled appropriately. Cities have the largest potential to reduce negative impacts through requirements on construction logistics. However, today, there is a lack of knowledge within cities on how to set such demands and how to involve and manage the numerous and varying stakeholders in these processes. This paper presents a participatory decision-making framework for the governance of urban construction logistics on economic, environmental and societal levels, building further on the Multi-Actor Multi-Criteria Analysis (MAMCA). The framework was then implemented on a use case in the dense urban Brussels-Capital Region (Belgium), gathering a wide variety of stakeholders in the context of a sustainable Construction Logistics Scenario (CLS) evaluation. Special attention was paid on the identification of implementation barriers and the role of governments to facilitate the introduction and city-wide roll-out of novel CLS. Findings show how different processes are site-, actor- and condition-specific, thereby delivering a common built object which is often based on different motivations and concerns. The study proposes a flexible, replicable and upscalable framework both from an inter- and intracity perspective, which can serve to support (1) the management of processes and CLS, (2) the management of people and the community, and (3) the project and city, in the context of multi-level governance.


Sign in / Sign up

Export Citation Format

Share Document