Study of bonded post-tensioned prestressed concrete construction technology, from materials, equipment, channel reservation, prestressed reinforcement material installation, concrete pouring, the prestressed tendons tension and grouting of anchor seal is described from the aspects of the construction of the link, the specific operation steps, summarizes the method of construction, improve the following prestressed concrete construction understanding.