Taguchi Method or Compromise Programming as Robust Design Optimization Tool: The Case of a Flexible Manufacturing System
2014 ◽
Vol 24
(5)
◽
pp. 160-164
◽
Keyword(s):
2014 ◽
Vol 53
(3)
◽
pp. 897-915
◽
2020 ◽
Vol 35
(4)
◽
pp. 2036-2044
◽
Keyword(s):
2019 ◽
Vol 29
(2)
◽
pp. 1-6
◽