material management system
Recently Published Documents


TOTAL DOCUMENTS

42
(FIVE YEARS 8)

H-INDEX

4
(FIVE YEARS 1)

2021 ◽  
Vol 2006 (1) ◽  
pp. 012027
Author(s):  
Yang Li ◽  
Xiaoming Huang ◽  
Minghui Lin ◽  
Ming Gao ◽  
Heng Yue ◽  
...  

2021 ◽  
Vol 3 (2) ◽  
pp. 69-72
Author(s):  
Xiteng Li ◽  
Xin Li ◽  
Baoqing Wang

In order to reduce the serious harm caused by emergencies to the safety of human life, and to restore the normal, as well as orderly development of the society and economy as quickly as possible, the method of reviewing literature, interviewing with experts and field research is used to explain the process of emergency material deployment. There are some problems and feasible suggestions on how to improve the emergency material management system, which plays an important role in promoting the establishment of a modern emergency management system.


2019 ◽  
Vol 46 (10) ◽  
pp. 909-923
Author(s):  
Farzaneh Golkhoo ◽  
Osama Moselhi

Construction material represents a major component of the project cost. Therefore, it is essential to control material on construction job sites. Efficient material management system requires trade-offs and optimized balance among elements of material cost including purchase cost, storage cost, opportunity cost, ordering cost, and unavailability cost. Thus, there is a need to develop an automated method for optimizing the delivery and inventory of construction materials not only in the planning phase but also in the construction phase to account for introduced changes. In this research a novel genetic algorithm – multi-layer perceptron (GA-MLP) method is proposed to generate optimized material delivery schedule. Multi-layer perceptron (MLP) is utilized to improve genetic algorithm (GA) by generating memory to overcome local minima encountered in applying GA for optimization. This automated method supports contractors to buy construction materials with the least cost and without leading to material shortage or surplus. The proposed automated method has been validated through a numerical example. The obtained results demonstrate that GA-MLP outperform GA in optimizing construction material inventory.


Sign in / Sign up

Export Citation Format

Share Document