Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work
2021 ◽
Vol 290
(1)
◽
pp. 26-35
◽
1995 ◽
Vol 22
(10)
◽
pp. 1089-1100
◽
Keyword(s):
Keyword(s):
2009 ◽
Vol 109
(16)
◽
pp. 913-917
◽
2015 ◽
Vol 83
◽
pp. 237-243
◽
2016 ◽
Vol 33
(05)
◽
pp. 1650034
◽
2012 ◽
Vol 29
(02)
◽
pp. 1250013
◽
2006 ◽
Vol 362
(1-3)
◽
pp. 273-281
◽
Keyword(s):