Project scheduling under uncertainty and resource constraints

PAMM ◽  
2017 ◽  
Vol 17 (1) ◽  
pp. 839-840
Author(s):  
Veronika Hartmann ◽  
Tom Lahmer ◽  
Kay Smarsly
2021 ◽  
Vol 11 (12) ◽  
pp. 5531
Author(s):  
Linlin Xie ◽  
Yajiao Chen ◽  
Ruidong Chang

Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the supply arrangement of prefabricated components. However, the traditional construction resource-constrained project scheduling implementation method cannot simultaneously consider the characteristics of the linkage between component production and on-site assembly construction. It cannot also fully adapt to the scheduling implementation method of the prefabricated construction projects. It is difficult to work out a reasonable project schedule and resource allocation table. In order to determine the relevant schedule parameters that can reflect the actual construction situation of the prefabricated building and meet the scheduling requirements of the prefabricated project, this study proposes a prefabricated construction project scheduling model that considers project resource constraints and prefabricated component supply constraints. Additionally, it improves the design of traditional genetic algorithms (GAs). Research results of the experimental calculation and engineering application show that the proposed project scheduling optimization model and GA are effective and practical, which can help project managers in effectively formulating prefabricated construction project scheduling plans, reasonably allocating resources, reducing completion time, and improving project performance.


Author(s):  
S Noori ◽  
M Bagherpour ◽  
F Zorriassatine ◽  
A Makui ◽  
R Parkin

The problem of matching production levels for individual products to demand fluctuations during multiple periods is known in the production planning literature as the multi-product multi-period (MPMP) problem. Linear programming (LP)-based solutions have been extensively reported in this respect. MPMP problems are commonly solved by using either analytic or simulation methods. More recently, hybrid solutions consisting of both analytical models and simulation analysis have been proposed where some operational criteria, e.g. the order of visit to machining centres, are taken into account. In this paper, results related to some of the literature based on hybrid solutions are used as the initial feasible solutions and then examined in the context of project scheduling by considering the influences of resource constraints. After converting the MPMP to a project network problem and assigning resources to activities and consequently levelling the resource profiles, it is discovered that machine utilization can be further improved by applying unused machine capacities. A LP model is therefore developed in order to maximize feasible production rates over all the production planning periods. The proposed approach results in improvements on the results of earlier hybrid solutions reported in the literature. Finally, three different planning problems are suggested for further applications of the proposed approach in the context of manufacturing environments.


Sign in / Sign up

Export Citation Format

Share Document