Time-Cost Trade-off Optimization Incorporating Accident Risks in Project Planning

Author(s):  
Moein Sadeghi ◽  
Ming Lu
Keyword(s):  
IARJSET ◽  
2016 ◽  
Vol 3 (9) ◽  
pp. 142-147
Author(s):  
Dr Mahmoud Abbas Mahmoud ◽  
Dr Luma Adnan AL-Kindi ◽  
Haider Najy Hady
Keyword(s):  

1982 ◽  
Vol 14 (2) ◽  
pp. 109-113 ◽  
Author(s):  
Suleyman Tufekci
Keyword(s):  

1998 ◽  
Vol 49 (11) ◽  
pp. 1153 ◽  
Author(s):  
E. Demeulemeester ◽  
B. De Reyck ◽  
B. Foubert ◽  
W. Herroelen ◽  
M. Vanhoucke

2022 ◽  
Vol 14 (4) ◽  
pp. 75-81
Author(s):  
Tatyana Novikova ◽  
Svetlana Evdokimova ◽  
A. Novikov

The guiding principles of project implementation are planning. The discrepancy in time, cost, and quality between the plan and the actual implementation of the project requires management decisions supported by an analysis of the optimization of the duration of the project and the search for reserves to reduce the implementation time. For this purpose, a basic PERT model for a specific project was developed, early and late deadlines for work, time reserves, and a critical path were calculated. This work is aimed at applying methods of evaluation and analysis of projects to find optimal solutions and control the efficiency of time and costs in project planning, by varying the work on the project and the executors of the work. The results of this study showed that there are quite large time reserves for works 5-7, 7-9, 6-9, etc., which makes it possible to redistribute work between performers and allows you to vary performers during the implementation of several projects simultaneously.


1997 ◽  
Vol 14 (4) ◽  
pp. 291-311 ◽  
Author(s):  
D. K. H. CHUA ◽  
W. T. CHAN ◽  
K. GOVINDAN

Sign in / Sign up

Export Citation Format

Share Document