Force Estimation on a Clamped Plate Using a Deterministic–Stochastic Approach

Author(s):  
Akash Shrivastava ◽  
Amiya R. Mohanty
1996 ◽  
Vol 6 (2) ◽  
pp. 211-225 ◽  
Author(s):  
Keh-Chin Chang ◽  
Wen-Jing Wu ◽  
Muh-Rong Wang

2020 ◽  
Vol 4 (97) ◽  
pp. 69-76
Author(s):  
IGOR N. SILVERSTOV

A stochastic approach has been developed to evaluate fatigue strength using elements of the fracture mechanics. The article presents a method for determining the initial parameters of statistical distributions. It also considers the method for constructing a fatigue curve for a component of any size and configuration with any given probability of failure.


2020 ◽  
Author(s):  
Kazumasa Miura ◽  
Tobias Seelbach ◽  
Thorsten Augspurger ◽  
Daniel Schraknepper ◽  
Thomas Bergs

2019 ◽  
Vol 279 (1) ◽  
pp. 93-106 ◽  
Author(s):  
Stefano Benati ◽  
Fernando López-Blázquez ◽  
Justo Puerto

2020 ◽  
Vol 53 (12) ◽  
pp. 5473-5487 ◽  
Author(s):  
Andrea Rispoli ◽  
Anna Maria Ferrero ◽  
Marilena Cardu

AbstractTunnel boring machine (TBM) performance prediction is often a critical issue in the early stage of a tunnelling project, mainly due to the unpredictable nature of some important factors affecting the machine performance. In this regard, deterministic approaches are normally employed, providing results in terms of average values expected for the TBM performance. Stochastic approaches would offer improvement over deterministic methods, taking into account the parameter variability; however, their use is limited, since the level of information required is often not available. In this study, the data provided by the excavation of the Maddalena exploratory tunnel were used to predict the net and overall TBM performance for a 2.96 km section of the Mont Cenis base tunnel by using a stochastic approach. The preliminary design of the TBM cutterhead was carried out. A prediction model based on field penetration index, machine operating level and utilization factor was adopted. The variability of the parameters involved was analysed. A procedure to take into account the correlation between the input variables was described. The probability of occurrence of the outcomes was evaluated, and the total excavation time expected for the tunnel section analysed was calculated.


2020 ◽  
Author(s):  
Pier Giuseppe Sessa ◽  
Valerio De Martinis ◽  
Axel Bomhauer-Beins ◽  
Ulrich Alois Weidmann ◽  
Francesco Corman

Sign in / Sign up

Export Citation Format

Share Document