Object-oriented software modeling of a Flexible Manufacturing System

1990 ◽  
Vol 3 (2) ◽  
Author(s):  
Sadashiv Adiga ◽  
Milind Gadre
2009 ◽  
Vol 25 (03) ◽  
pp. 168-173
Author(s):  
Ji Wang ◽  
Yujun Liu ◽  
Zhuoshang Ji ◽  
Yanping Deng ◽  
Yuanyuan Zheng

The hull job shop in a shipyard is a typical flexible manufacturing system (FMS), the flexibility and efficiency of which largely depends on the level of FMS scheduling. In this paper, the Object-Oriented Colored Petri Net (OOCPN) is used to build the FMS model for the hull job shop. A four-step modeling method of FMS has been developed to successfully simulate the scheduling of the hull job shop.


2019 ◽  
Vol 18 (02) ◽  
pp. 293-310
Author(s):  
Ari Setiawan ◽  
Rachmawati Wangsaputra ◽  
Yatna Yuwana Martawirya ◽  
Abdul Hakim Halim

This paper discusses production scheduling problems on CNC-machines having a set of cutting tools in a Flexible Manufacturing System (FMS) to maximize the cutting tools utilization. This objective has been selected because it is frequently found that cutting tools are under-utilized as they are used far below their respective lifetime limits. We will consider the situation where several identical CNC-machines are operated in an FMS; each of which is equipped with the same cutting tool configuration. The jobs to be scheduled are machining parts, and each of the parts requires one to two stages of processes, and each of the stages consists of several sequential operations, where a specific operation requires a certain type of cutting tool. Whenever a certain cutting tool is being used, the time consumption will be accumulated to calculate its remaining lifetime. The assignment of an operation to a particular CNC-machine will be based on the sufficiency of the cutting tool remaining lifetime to complete the operation. We formulate the problem in a mathematical model and then solve it using a solution method based on the object-oriented modeling approach, where the FMS elements are grouped as classes of the objects, i.e. the CNC-machine, the cutting-tool, the product (job) and the storage classes. Numerical examples show that the proposed solution method can effectively solve the scheduling problem.


2021 ◽  
Vol 60 ◽  
pp. 176-201
Author(s):  
Yepeng Fan ◽  
Jianzhong Yang ◽  
Jihong Chen ◽  
Pengcheng Hu ◽  
Xiaoyu Wang ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document